Construction update Footings and concrete are done. Framing is next. Read the update
Rendering of The Rock from the drop-off loop at sunset, with a long low roof and stone base

Wood, stone and room to gather.

Designed by Mohagen Hansen and built by Ebert Companies, The Rock gives students a warm, solid place of their own, right across the road from school.

Land donated and recorded with Hennepin County.

Across the road from Rockford High.

Students can walk over before the first bell. The land was donated to the project and recorded in September 2024.

  • Address7200 Dogwood Street
  • CornerDogwood St (County Rd 92) at Rebecca Park Trail (County Rd 50)
  • CityWithin the City of Greenfield, serving the Rockford area
The fenced site with survey stakes, Rockford High School buildings in the distance
The site with survey stakes in, November 2025.

Every room has a job.

Six spaces planned so far. Renderings by Mohagen Hansen; final finishes may change.

Rendering of the assembly hall with exposed wood beams
Assembly hallBreakfasts, banquets and big gatherings under tall pine beams.
Rendering of the main hallway with students
Main hall and entryA bright way in, with room to hang out before school.
Rendering of the seating nook just inside the main entrance
Entry wayA seating nook just inside the main entrance, with room for small groups.
Rendering of the student lounge with a foosball table and a kitchenette counter
Student loungeSoft seats, games and space to hang out before school.
Rendering of the commercial kitchen with stainless steel prep tables and walk-in storage
Commercial kitchenShared with RiverWorks for the Food Shelf and Lunch Box programs.

Counseling offices

Space set aside for mental health counseling, so students can get support close to school.

Concept floor plan of The Rock: the assembly hall, student lounge, offices, kitchen, patio, parking lot and drop-off circle
The floor planEvery room under one roof. Concept plan by Mohagen Hansen; the final layout may change.

All footings are complete.

Every great vision starts with a solid foundation.

From an empty lot to footings, one step at a time. #buildtherock

  1. Footings and concrete are done

    Doboszenski and Sons laid the driveway and parking lot, F.H. Schmidt Inc. completed the footings on November 19, and temporary power is installed. Framing is scheduled for 2027.

    Poured concrete foundation walls on the site, with houses and bare trees behind
  2. Footings poured

    Concrete went into the forms around the steel rebar. This is the base the whole building stands on.

  3. Phase 2: sewer and water

    City permits in hand. Hennen Construction put in the in-ground sewer and water.

    A semi truck delivering pipe to the site at sunrise
  4. Site cleared and excavated

    Gearin Outdoor Services cleared the land and Doboszenski and Sons graded and excavated the lot.

    An excavator and dozer grading the site beside the road
  5. Groundbreaking

    Founders, builders and neighbors prayed over the land with Pastor Keith Robinson of Riverwood Covenant Church, then put shovels in the dirt.

    Founders and supporters holding hands in prayer at the groundbreaking
    Photo: Kyle Thomas, KT Creative
  6. Kickoff on the land

    Families, students and the mayors of Rockford and Greenfield gathered at the site to launch the project.

    A crowd gathered under a tent at the kickoff as the sun sets

Walk the site with our team.

Hard hat tours run on set dates. Bring your family, your business partners or your small group.